101 reputation


Die-hard developer.
Not afraid to go low-level (even down to assembly when needed during debugging).
Prefers readable code over short, complex, 'would-be-smart', unreadable code.
Musical preferences: EBM (Front 242), Synthpop (Human League, Heaven 17), Electronic stuff (Kraftwerk) and most things that don't fit mainstream (Severed Heads, Isao Tomita).
Likes 80's pinballs (Comet, High Speed)