I have an add-in that works in Microsoft Project Professional 2019. Will this same add-in work in Microsoft Project Online Desktop Client?
I installed the add-in on a PC that has Project Online Desktop Client installed. The installation went through with no errors and I can see the add-in in installled programs. However, when I open Project Online Desktop Client the add-in does not show.