Questions tagged [metrics]

In PM, metrics are measures of things. Defining, selecting, applying, or calculating measurements of progress or activity on a project.

Filter by
Sorted by
Tagged with
0 votes
3 answers
21k views

Scrum , Velocity calculation and Sprint Calculation

Following figures showing the performance of a Scrum team during the first 6 sprints of a project. Sprint: 15 SP Sprint: 5 SP Sprint: 20 SP Sprint: 15 SP Sprint: 25 SP Sprint. 10 SP Question 1: ...
1 vote
3 answers
251 views

How can I close an Epic with open defects?

I have an Epic. Some defects are closed, but one defect is still opened and deferred until the next release. How can I close the current Epic since one ticket is still not closed?
0 votes
1 answer
44 views

estimating time for a step that has batch process in project management

Im trying to estimate cycle time of a process. For example if I am making widgets where each widget type has different process times. However in one of the steps in the process, it is a batch process ...
1 vote
3 answers
2k views

How can I track time spent by assignees on each ticket in JIRA?

I want to track time spent by each agent on each task on a JIRA Kanban board. If an agent was assigned a task and he assigns it back to me, I want to track the time he spent assigned to the ticket. Is ...
3 votes
1 answer
480 views

Sprint planning, review: velocity,capacity, forecast and how this values relate?

I'm fairly new to Scrum and its sprint planning/retro (etc), our team today was trying to calculate velocity, capacity and forecast for the following sprint, but we just realised that no one actually ...
9 votes
9 answers
4k views

Is a project manager responsible for completing a project on time?

Of course, a project manager should strive to complete a project on time, but is it correct to say that it is a project manager's professional responsibility? I mean that no matter how professional a ...
1 vote
2 answers
223 views

Did I input the correct ACWP, BCWS and BCWP values? [EVMS]

I know I performed the calculations correctly but I'm not confident about the 3 values in red
1 vote
1 answer
54 views

How to handle unequally distributed material cost in EVM

I am looking into Earned Value Management and seem to be unable to find anything useful on how to deal with large material cost, which are not equally spread over the project. All examples that I have ...
9 votes
6 answers
1k views

Is tracking billable time for Scrum ceremonies in JIRA an anti-pattern?

We use Story Points for estimating complexity of User Stories, but we bill hours to the client. This is the very first Scrum project within our company, and we don't have enough data to calculate a ...
0 votes
1 answer
27 views

I need a way to group or nest items within columns

I am trying to analyze a data set that has nested data. I have a column that contains projects, a column that contains activities of those projects, and dates that those activities were completed. I ...
18 votes
3 answers
45k views

What SMART goals can I set for myself as a new Scrum Master?

I'm transitioning from a Project Manager to a Scrum Master, and I need to come up with some examples of SMART goals for the new role. The goals are for my Annual Performance Reviews where I will be ...
1 vote
1 answer
30 views

How to create data entry template to be updated monthly by 20 different parties online - focus is recycling data?

The task at-hand is I coordinate the activity of 20 organisations, each of whom I need to collect monthly data from directly, about the tonnages and types of elecronic items they collected for reuse ...
8 votes
4 answers
2k views

Is gauging a team's performance using scores assigned by other stakeholders valuable?

We have a new way of gauging teams. All the individuals involved (business owners, managers, stakeholders) except the team itself gauge how they felt the team did using a score. If the score is ...
1 vote
1 answer
117 views

Aggregate KPI for time and performance

I have a project KPI that I can measure daily: the use of a bottleneck resource, measured as the % against a target value of hours of use. Example: Week_1 day_1: 100% day_2: 95% day_3: 95% day_4: ...
1 vote
2 answers
3k views

How to Calculate Effort Variance in Scrum

My team currently works in 3 week sprints and we are capturing Key Performance Indicator (KPI) for each sprint. One of the KPIs is Effort Variance (EV) per sprint My question is at the end of the ...
2 votes
2 answers
66 views

Net Promoter Score-like metric for internal "monopolistic" product

I'm working on product that is integrated as part of the bigger package of products. One kind of stakeholder are other product teams that request features and use features from us. Other kind of ...
0 votes
2 answers
5k views

How can we track Business as Usual (BAU) work?

My team, which consists of network architects and developers has been running Scrum for the past couple of months and the biggest issue we have is how we're supposed to record BAU work. We consider ...
14 votes
3 answers
2k views

Is velocity a valid measure of team and process improvement?

I've asked this question to few scrum masters: "How do you tell, that your team is improving? How do you tell that actions taken during retrospective result in real improvement in efficiency/...
3 votes
6 answers
5k views

A simple estimation accuracy formula that always yields 0-100?

I'm just beginning, and despite my search, I cannot find any simple formula that would return a number between 0 and 100%, i.e. I do not care whether there was over or underestimation. The simplest ...
2 votes
4 answers
2k views

How do you measure time units in sprint velocity?

I am trying to get my head around "Story points" using the Scrum methodology. As a starting point, I have been following the following article: http://scrummethodology.com/scrum-effort-estimation-and-...
4 votes
2 answers
1k views

How to manage sprint velocity when someone does both design & development?

Background I work at a startup where I'm the only designer (UI/UX/Visual), however, we don't have an actual front-end developer, so most of the HTML/CSS development also falls on me as I'm half-...
3 votes
2 answers
136 views

Should we count a story that is no longer required by Client/PO/Management in our velocity?

We have finished a story which is no longer required by the Product Owner (PO) or Management. The completed story is not going to add any business value. What should we do in this case? Should we ...
12 votes
5 answers
5k views

Team velocity fluctuates a lot, how to find the root cause?

I have plotted my team burn up chart and its velocity per iteration. To me it looks really bad (velocity fluctuates a lot). What should I be looking for to diagnose the root cause of this behaviour?
5 votes
2 answers
328 views

Velocity calculation based on number of user stories completed in a sprint

In one of the projects, the velocity calculation is done based on the number of user stories that the team is delivering in each sprint. They are using story points to size but still the velocity is ...
4 votes
4 answers
959 views

Is a zigzag, sawtooth velocity a problem if the trend is consistent?

I am supporting and coaching several scrum teams working on different areas of the same software project. Sprints are 4 weeks long, except that sprints spanning the Christmas/New Year holidays are 5 ...
3 votes
2 answers
2k views

How to calculate velocity when using fibonacci estimates

We are using Scrum and our user stories are estimated using the Fibonacci sequence. I understand the benefit of using the Fibonacci sequence for estimates. In all references to velocity it is ...
8 votes
3 answers
2k views

Is it possible to track velocity on a waterfall project?

Assuming similar work has been done in the past, can velocity be measured on a waterfall project? If that isn't the case, is there a more appropriate capacity management tool on a waterfall project?
1 vote
2 answers
251 views

How will team changes impact velocity of a Scrum project?

Question If there are 8 members in a team assigned to complete the project. 20% of the team left during the particular sprint. Does the velocity change? If so, what would the velocity changes be? ...
4 votes
1 answer
86 views

How to make Agile metrics useful to stakeholders and project managers

I have started using Actionable Agile lately. This tool is essentially used for Agile Metrics e.g. Cycle time, throughput, monte-carlo predictability etc. Does anyone know how I can translate this ...
2 votes
1 answer
55 views

Why is customer churn rate calculated in relation to users at the beginning of a period, not people at beginning plus acquired?

Let's take the customer churn definition from this article, that I have also seen in other sources. Let’s do the maths with one example: On January 1st you have 1000 customers. 100 of them are not ...
6 votes
5 answers
6k views

What is the value of tracking hours in a Sprint burn-down chart?

The burn down chart will have story points on the Y-Axis and duration (number of days) on the X-Axis. My team is able to complete the stories almost at the end of the Sprint. This means the burn down ...
1 vote
3 answers
3k views

Current best metrics related to requirements, design and architecture

So my boss put forth a 'research and find out question' to me: Are there ANY (absolutely any, no matter the dumbest, but any) metrics for requirements management? Eg. Requirements completeness, ...
3 votes
4 answers
303 views

How often should a development team review code quality metrics so that we keep reasonable control over technical debt and code quality

Is there any recommended practice for how frequently code quality metrics should be reviewed by the team? I'm not sure how often should we be conducting a review of code quality metrics to look for ...
1 vote
3 answers
160 views

Can code base metrics be used for budgeting for software engineering or code maintenance?

Recently my manager asked my team for some metrics on the code base, in order to budget for my team. These are the metrics requested: Number of source code files Code Lines Comment Lines Blank Lines ...
1 vote
1 answer
152 views

How can the team improve the likelihood of completing each increment?

If a Development Team doesn't have the skills or tools to create a “Done" increment, are there techniques that can be used immediately that will allow progress on the increment to be easier to track? ...
16 votes
2 answers
5k views

What are some agile (scrum) metrics? [closed]

I'm interested in learning what types of metrics can be used in the following areas: Productivity Quality Responsiveness Customer Satisfaction Employee Satisfaction Predictability ...and what makes ...
3 votes
3 answers
1k views

How to count the amount of times a JIRA issue has been in a specific state?

In my project one of the metrics we want to use is the amount of times a JIRA issue is moved back from "QA" to "Development." We call it "comeback rate." Looking for % of items that were resolved by ...
6 votes
2 answers
3k views

What metrics can we generate from t-shirt sizes (rather than story points) when estimating user stories?

If I am using T-shirt sizing for my user story estimates, what metrics I can measure and report? We currently use a Sprint burn-down chart when using story points.
2 votes
4 answers
1k views

Can EVM be Used to Track and Manage Quality?

Currently, I think I've got pretty good tools when it comes to measuring Budget (enough and more Excel docs that are regularly updated), Scope (against a mutually agreed upon statement of work), Time (...
1 vote
1 answer
142 views

What metrics should be used for tracking the quality of research project?

It is known that software development tasks should be controlled by some project management metrics, that show the progress of work at each particular moment of time. What metrics are better to be ...
20 votes
3 answers
16k views

What are some commonly tracked metrics in Kanban?

I'm currently working with a development group that has a variety of project management approaches. They use a Kanban board for tracking work with a constantly re-prioritized backlog, they have ...
2 votes
4 answers
188 views

Agile ("Scrum") "Metrics" Question

My team has recently transitioned from essentially zero project management (other than the "put out fires as they happen while trying to stay on top of current workload") to something more Agile with ...
0 votes
3 answers
328 views

If you measure requirement volatility, how do you handle inconsistent requirement size?

I would like to measure requirement volatility but the problem is that our specification is not consistent in size of requirements. Sometimes, one requirement describes a whole workflow. Sometimes it ...
6 votes
1 answer
302 views

What Does "Commitment" Look Like with Agile Projects?

When engaging with a client on a project that will be developed using agile methodologies, what is being promised in the delivery of the project? How do you know if that promise is objectively met? ...
1 vote
1 answer
542 views

How to use historical cycle time to forecast project completion

I have been inspired by Daniel Vacanti's talk (link) about using cycle time to forecast project completion. So I collected the following user stories metric in the course of four sprints: Average ...
0 votes
3 answers
776 views

Metrics to measure teamwork / team spirit

I recently started as manager of a team of 10 developers that did manage itself before. I noticed that they do not act that well as a team but rather everybody fights for his own. There are a lot of ...
1 vote
2 answers
678 views

Cycle Time - Story vs Task?

I am trying to measure the cycle time of my team. The problem is that the issues (tasks or stories) have very different sizes. Sometimes someone just creates a task like: "Create a backend api", that ...
1 vote
3 answers
581 views

How to measure bug incidence in Production?

We have a fully automated deploy process but as we now sometimes we break things. When this happens the developer just apply a hot fix in (branch, fix and opens a PR) the trunk development. As you ...
3 votes
1 answer
282 views

If SAFe must be continuously calibrated and measured in ideal days, why does the framework say recalibration is unnecessary?

TL;DR SAFe says you don't need to recalibrate estimation, but requires estimates and other metrics to be normalized across one or more Agile Release Trains. Context, question rationale, and the ...
8 votes
5 answers
703 views

What is the difference between metric and KPI?

I know that KPI is a metric and metric is not necessarily a KPI, but I still don't understand the difference between these two. Let's take Periscope application as an example. What are possible KPI ...