Podcast #128: We chat with Kent C Dodds about why he loves React and discuss what life was like in the dark days before Git. Listen now.

Questions tagged [ms-project-2013]

The tag has no usage guidance.

Filter by
Sorted by
Tagged with
0
votes
0answers
24 views

Values such as (EV) and (PV) does not show in some tasks

I have been working on a project for a while now, i've always faced the issue that the MSP project does not show me all the values like the planned value (BCWP), BCWS... ( in some task it is shown) ...
2
votes
1answer
57 views

Work resources that don't influence the duration of the task

I work on a construction project. I have a task that needs 1000h to be completed. Depending on the amount of manpower, the duration of the task will vary. To complete the task I need scaffolding that ...
1
vote
1answer
31 views

Microsoft Project 2013 - Auto leveling according to Resource Availability

I am building a project plan on Microsoft Project 2013 and can't understand why it is not allocating a resource. I have a task set as auto scheduled, fixed work, with a 7 day effort assigned to a ...
2
votes
1answer
62 views

How to add dynamic date footer to project print-out?

I see other people printing our project's Gantt chart with an up-to-the-date date on the bottom. How do they to do that? Is it automatic or must one do something every time one prints the chart?
1
vote
1answer
260 views

Work days and Duration does not match

I am using a 5 working days & 8 hours standard calendar. My task is 30 days . I have selected a start date on Monday and end date on Friday (30th work day) but the durationn reflects as 40 days ...
1
vote
1answer
39 views

Report in MS Project (Hr/task/resource)

I am trying to find/create a report in MS Project 2013 in order to display hours done in a month by a certain group of resource or a resource only (they are already grouped in the Allocation tab) with ...
0
votes
1answer
47 views

MS Project burndown for outline level

I'm working on creating a burndown graph for a large project that I'm trying to schedule, but I don't want the sub-tasks to be counted as a remaining actual task for the burndowns. Is there a method ...
1
vote
1answer
44 views

MSProject show main resource on Summary tasks

How can I show the main (resource with maximum hours) for Summary tasks. I suspect I would need to set a custom text field to show this, but how would I structure this? thanks
-1
votes
2answers
69 views

Task Approval before Publishing

I have received a requirement to customize our Project Server 2013 implementation as follows: Several project managers can add tasks to the same project plan A centralized focal point is responsible ...
0
votes
1answer
119 views

MS Project 2013: Can I avoid MSP auto-changing my assignment units to less than 100%?

Curious if there is a way to avoid Microsoft Project auto-adjusting the assignment units, when I add a resource in the Resource name column. In the project settings all resources are set to 100% ...
1
vote
1answer
652 views

Why are tasks split while updating plan?

I inserted the actual start for updating a task and then inserted the %comp and reschedule and resource leveling for the plan with ms project 2013. The problem is that the task has been split in ...
2
votes
1answer
63 views

How to Specify how Text Colours Should Override Each Other in MS Project

This is a little embarrassing, but I cannot figure out how to do this. I have added Text Style formatting, but I need to change the priority of the formatting. I have Critical Path tasks formatted ...
0
votes
2answers
76 views

Start and stop in MS Project

I have a lot of situations where there is a small project that is, let's say, 50 percent done. Then it's completely put on hold, and restarted a month later. How is it best to accurately reference ...
1
vote
1answer
51 views

MS Project Column Time different from Project Time

In MS Project 2013 I am attempting to get a particular column to show time unit in Days but leave the default Project Time Unit as minutes for all of the other columns. I can set the Project default ...
-1
votes
1answer
258 views

Add a PWA Enterprise Custom Field to Project Pro

I've added an Enterprise Custom Field to tasks in Project Web Access (under Sharepoint 2013) but when I open an existing project published on PWA in Project Pro 2013 I don't see the new field. It ...
2
votes
1answer
199 views

Looking for a way to remove an errant calendar from MS Project Professional 2013

I have a project file with a project calendar that shows up in the Change Working Time dialog box's For Calendar dropbox that is not being using in the project file. I've looked in the Calendar tab in ...
0
votes
1answer
23 views

MS Project 2013 cost adjustment

I would like to know what is the best way to handle cost adjustment to the baseline in MS project. Do you save the baseline when you adjust the cost when you get new estimate or not?
0
votes
1answer
216 views

Why does my Earned Value curve go back to zero

I managed to simulate a project in MS Project 2013. I created an initial planning, assigned ressources and put this in a baseline. Then I imagined two status for my project in two different dates. ...
1
vote
1answer
28 views

Un-wordwrapping columns in MS Project 2013

There doesn't seem to be an easy way to "un-wordwrap" columns in MS Project 2013. According to the docs, if I toggle wordwrap off and then manually adjust each row, wordwrap will snap off. I was ...
0
votes
2answers
41 views

Must every task in MS project be linked with each other?

The project is composed of three groups of teams, each team will contribute to the project plan. The team has listed their tasks, my question is whether all tasks should have a predecessor and/or ...
1
vote
1answer
333 views

MS Project autoschedule - full days of work are bleeding into next day

I'm scheduling weeks of work in Microsoft Project (2013) wherein each task will normally take a full day of work/duration for a crew. I'm scheduling them for 10-hour days and the duration of the work ...
1
vote
1answer
392 views

Can't find the Task Name column in MS Project 2013

When I create a new project in MS Project 2013, there is no option to add the Task Name column. I've tried clicking on Add New Column but Task Name doesn't appear there: The following (from a ...
0
votes
1answer
82 views

Scheduling hours over a fixed duration in MS-Project 2013

I am new to Project and, rather than spending anymore time reading the web, I thought I'd appeal to some experts. In our company we often schedule tasks similar to the made-up one just below. We are ...
3
votes
2answers
1k views

How can I display buffers in MS Project?

I work on a subproject, the timelines of most work packages we are managing are non critical. In most cases, we have a scenario like this: Team A needs to work 10 days, but can do this anytime during ...
0
votes
2answers
4k views

Show resources grouped by high-level summary task in MS Project

I'm managing a project in MS Project Pro 2013 with several phases, which I have distinguished by summary tasks. Under these summary tasks I have plenty of other tasks, several again summarized. Note ...
0
votes
2answers
70 views

How to edit groups of tasks in Microsoft project?

I want to change hundreds of tasks in a project from "fixed work" to "fix duration" type. When I select multiple tasks - the "Information" dialog changes only one if them. I have also tried to add a ...
1
vote
1answer
419 views

MS Project 2013 - SubProject Finish Date not Calculating Correctly

I have a Master Project with a subproject. Inside the subproject there are two tasks. If opened alone and calculated (F9) the subproject finish date will roll up correctly. If the Master Project is ...
0
votes
1answer
93 views

MS project 2013 - complex resource allocation

I have used MSP before but not for years. I have some long term tasks and I would like to allocate varying quantities of resource requirement (against single resources) each month on these tasks - ...
1
vote
2answers
704 views

How to get MSProject to automatically increase resource usage to over 100% when the average Acutal Work hours is above the standard day work hour?

Let's assume that the standard number of hours worked per day is 8h I have a task with a Duration of 2 days and 16 Work hours The resource RA is assigned 100% to this task. this task mode is set to ...
0
votes
1answer
57 views

Filter with wrong total actual work

I have a problem with filtering in Microsoft Project 2013. When I create a filter based on some criteria, the results doesn't show correct total work and actual work. In fact, it sums actual work of ...
0
votes
1answer
1k views

MS Project: Finish Variance formula simplification

I've set a formula to monitor variance between baseline and scheduled finish. I know that there is a simple finish variance column for this kind of thing, but in my organization we've got certain ...
-3
votes
3answers
154 views

Earned value analysis by client and vendor

We all know that some project managers (those that follow PMBOK/PMP) do earned value analysis to know SPI and CPI. Schedule Performance Index (SPI) = Earned Value ÷ Planned Value -- How are we doing ...
0
votes
1answer
486 views

Difference between max units and assignment units in MS Project

I know difference between assignment units and Peak units , but can any one explain how max units and assignment units are related to each other ?
1
vote
3answers
123 views

MS Project: Few basis questions on tasks management

I have seen different managers entering preferred Duration in days and some in hours. Is there any best practice? I have seen many manager will update "% complete" to update a task progress. Is this ...
1
vote
1answer
4k views

Changing default time from 0.88 days to 1 day

In Microsoft Project 2013, when I enter a start day of 16/6/2016 and end date of 16/6/2016, the default duration is 0.88 days. When I go into change working time it shows 8 hours per day. Problem is, ...
-1
votes
1answer
86 views

How can I view the tasks which are assigned to my organizational team members?

I am a team lead and we are using Microsoft Project Server 2013. My team members have many tasks assigned across different projects. How can I view the tasked assigned to my team members within ...
0
votes
1answer
172 views

Working (part of) an MS Project schedule backwards

I'm trying to make a portion of my MS Project schedule work backwards, and it's not working quite right. I'm hoping you can help. I have a schedule where Task 45 ends on 2/1/17. Tasks 46 through 50 ...
1
vote
2answers
2k views

Relationship between Work, Duration and Units in Microsoft Project 2013

I am struggling with Work/Duration/Units. Example: I have a product that takes 184 hrs to build, we typically have 5-6 guys working on it and in real time, takes about a week to complete. When I ...
0
votes
1answer
6k views

How to show how late a task is in MS-Project 2013?

When a task is late in the status how can we set it up to show how many days it's late not just late? I want to see on each task how many days it's late.
1
vote
2answers
1k views

Drop-down menus in MS Project 2013 disappeared

In one of my MS Project 2013 files, the drop down menus appear when I hover over the column headers in the Task Sheet view. In another file and new files, the drop down menu option does not appear in ...
0
votes
1answer
36 views

Is there a way to links tasks that have overlapped dates?

for example, if I have two tasks start at different dates that end at the same date. My problem is, if I try to link these two tasks, the dates will automatically change, not the original dates I ...
2
votes
3answers
1k views

Plan a task multiple times

I want to make some form of recurring task that will occur after specified other tasks. Instead of every x days/weeks/etc. occur after Task X, Y and Z (self specified) Any help would be appreciated, ...
3
votes
4answers
1k views

How can I do Change Request on Microsoft Project?

Title is self-explanatory. MS Project 2013 for reference. I'm not allowed to disclose many details of the project, but it's a small/medium scale IT project with a team of 6 people. I have everything ...
0
votes
1answer
789 views

PWA's Project Center Timeline Not Adding Tasks or Projects After Editing Webpart

My organization uses Project Web App integrated with Sharepoint task lists to share project plans and delivery schedules. Project Web App's Project Center has an aggregate timeline feature, which ...
0
votes
1answer
676 views

MS Project 2013 resource graph

I am using the standard calendar. Have a resource available 100% of the time. When I add the first task, a 1 hr task, when I look at the resource graph it shows at 100%, I have it set for an 8 hour ...
-2
votes
1answer
2k views

what is the reason of calculating duration in Microsoft Project in decimal form?

when I enter the start times and end times of tasks, software calculates duration of task in decimal form. I have checked calender setting and I think it is correct but I can't solve this problem. I ...
3
votes
1answer
138 views

MS Project 2013 - Resource Overallocations during specific time period with 100% Availability

Is there a way to set resource availability by task (not project) during a specific time period in MS Project 2013 ? For example there is a resource allocated to Task 1 that starts in Dec 2015 and ...
1
vote
1answer
287 views

Creating an MS Project task with fixed duration and work, but variable resource loading

I have a Microsoft Project 2013 schedule where I would like to have an overall task that takes 100hrs from 3 resources. ResourceA and ResourceB will be fully loaded for 90% of that time. ResourceC is ...
2
votes
2answers
1k views

Adding unnumbered task in MS Project 2013

I need to add a task to my WBS/Gantt Chart in MS Project, but not number it as it is a task (Kickoff meeting) that I want to fall under the heading: Project Administration. I need this to be a general ...
1
vote
2answers
23k views

How to assign multiple resources to a in MS Project and making them work different hours over the same duration

I am trying to load resources into tasks in MS Project 2013 Standard. The tasks have specific durations for when they should start and end. For each task, I would like to assign multiple resources and ...