Skip to main content

Questions tagged [ms-project]

Use this generic tag for questions that apply to most versions of Microsoft Project. For version-specific questions, please use an alternate tag instead of the catch-all tag. Version tags currently include: ms-project-2003, ms-project-2007, ms-project-2010, ms-project-2013, and ms-project-2016.

Filter by
Sorted by
Tagged with
0 votes
1 answer
40 views

MS Project: How to auto-level tasks across multiple resources

I have a project that requires a large team of personnel, with multiples of each role (e.g. 3x quality engineers, 4x manufacturing engineers, 10x operators etc). The roles are fully generic and ...
Kendric Rendle-Short's user avatar
0 votes
1 answer
159 views

After Office update, macros are blocked in MS Project

I have MS Project 2019 Pro standalone desktop version. I regularly write and run macros for myself and other users. Two days ago I updated Office to version 2408 (Build 17928.20114). Today I tried to ...
john-project's user avatar
1 vote
1 answer
46 views

Should we have separate tasks for n number of tasks?

Suppose there are three tasks, A, B, and C, each requiring 10 days to complete. I started task A but had to stop it after 5 days. Then I started task B but stopped it after 3 days to resume and ...
Moiz's user avatar
  • 11
1 vote
1 answer
22 views

Will MSP 2019 add-ins work in Project Online Desktop Client?

I have an add-in that works in Microsoft Project Professional 2019. Will this same add-in work in Microsoft Project Online Desktop Client? I installed the add-in on a PC that has Project Online ...
Stephgo's user avatar
  • 11
0 votes
2 answers
47 views

Auto scheduling in MS project

I have these tasks as an example with the dates shown. I have around 200 cells. Is there any way I can automatically input the dates depending on the duration each task takes? Thank you! here is the ...
sounaz's user avatar
  • 1
0 votes
1 answer
145 views

How can I get MS Project to display calendar days for duration rather than working days?

I've got start and end dates defined for activities in MS Project (latest Office 365 edition), and have set the calendar to "none" and tried both "ignore calendar" checked and ...
Todd A. Jacobs's user avatar
  • 50.7k
1 vote
1 answer
64 views

Re-Organize Task IDs in MS Project

In MS Project Professional (Online Desktop Client), I made several tasks that are all occurring simultaneously, with nested tasks for each one. To prioritize and organize my task list in order of ...
tyster02's user avatar
0 votes
0 answers
22 views

MS Project: correct redistribution of resources in a fixed work activity when change the duration

I'm using Microsoft Project 365 and I've the following problem: from a fixed work activity, if I add one or more resources in the task, the duration decreases correctly. Instead, if I decreases the ...
Daniele Belli's user avatar
1 vote
1 answer
29 views

Find Overdue Dates for Each Resource within a Task that has Multiple Resources Assigned

I have projects that have multiple resources assigned to tasks. I created a macro to find overdue tasks, unfortunately, it only considers the task finish date, which, may be different for some of the ...
GregB's user avatar
  • 11
0 votes
0 answers
31 views

MS project web version - create new template of working hours calendar

I'd like to edit working days for the MS project web version This MS project version is built on top of MS Powerautomate platform of M365 (MS Dynamics) and it seems you need to adjust organization ...
Tomáš Petržilka's user avatar
0 votes
1 answer
54 views

How to include starting date for duration calculation

The date calculation in excel and MS project is different. Excel includes starting date for duration calculation when equation is applied, but MS Project does not include it. For example from 21-Mar ...
user57241's user avatar
0 votes
0 answers
42 views

show a sum of a specified ressource in a column

I have a project that is working fine. Anyway i want to show a column with the sum of a particular ressource. Let me explain with example. i have a tasks that uses distances. i insert for each task a ...
Tax Raoul's user avatar
0 votes
1 answer
40 views

How can I calculate the working days starting from the hours in the "Work" field in Microsoft Project?

probably a trivial question about Microsoft Project. I have a task like this one: As you ca see there is the Work field that contains the worked hours. There is a way to set it in days instead hours? ...
Andrea Nobili's user avatar
0 votes
2 answers
74 views

In Project how can I avoid that when the end date of a task changes the duration is re-calculated?

I am finding the following problem with Microsoft Project. I defined a task that for example have a duration of 10 days but these 10 days can be spread in a longer time (for example one month) because ...
Andrea Nobili's user avatar
0 votes
1 answer
159 views

MS Project - how to create a level of effort task for weekly meetings

I'm trying to create some level-of-effort/hammock tasks that span from project start to project finish. For example, 1h/wk team meetings, 1h/month invoicing. Is there a convenient way to make such a ...
jake's user avatar
  • 103
1 vote
2 answers
110 views

Assign a Variable to a Duration

I am trying to set up a project for a typical product development, but want to be able to make specific durations a variable that I can easily change once to apply to many different tasks at once and ...
Jhey's user avatar
  • 11
0 votes
0 answers
44 views

Combine 40h/week ressources and 80h/week ressources but counting 1day duration as one calendar day both

I want to assess the amount of resources needed to realize a task with calculated work-load and assumed duration. In other words, how many resources do I need to realize workload X in given duration Y....
David K.'s user avatar
  • 101
0 votes
0 answers
35 views

MS Project replicates all Master Project tasks within each subproject

I'm using MS Project 2021 desktop. I've created a Master Project, and about 14 subprojects under that. I'm using a Resource Pool which each subproject can draw resources from. The issue is, somehow ...
RogueTrader's user avatar
0 votes
1 answer
75 views

Milestones based on calendar days

I am absolutely new to MS Project. I need to set milestones at 25%, 50%, 75% based on days from the start of the project. So for a 400 day project I need milestones at 100, 200, and 300. How can I ...
VictoriaH's user avatar
0 votes
2 answers
72 views

Lead/Lag and Duration Scale

Can somebody please answer following queries: Whether it is okay to present the duration of tasks in days vs. part of days (e.g. 0.2 days for certain tasks)? Whether project schedule will be okay? ...
user56521's user avatar
1 vote
3 answers
895 views

MS Project Date Auto Update when Adding Predecessors

I am creating and updating an integrated multi-project/vedor MS Project task tracker with the sole purpose of finding date issues, dependency issues, etc., so that we can align vendors in future ...
evolutionofj's user avatar
0 votes
0 answers
33 views

How to import the employee's work hours to TimeScaleData in microsoft project file using vsto add-in

How to import the employee's work hours to TimeScaleData in microsoft project file using vsto add-in? Here is the sample data I have, [{Name:"Phase 1", BaselineStart:"2023-01-01", ...
sridharnetha's user avatar
0 votes
0 answers
20 views

MS Project multiple entry dates with hours worked for single task

What is the best way to maintain the following hierarchy in Microsoft Project (.mpp) file? Country will have multiple Jobs and each Job will have multiple of Phases and each Phase will have multiple ...
sridharnetha's user avatar
0 votes
1 answer
38 views

Replacement for Project 2010 that lets multiple users edit at once?

We've been using Project 2010 and have a file saved to our network which we all enter data into and modify to track our projects. With licenses for Project 2010 no longer available, we were looking to ...
Fred's user avatar
  • 1
1 vote
1 answer
227 views

MS Project - adding an exception to a resource calendar for a working day on a defined non-working day throws out % Complete value

I originally asked this question in the 'main' site (link) but given that the behaviour seems to be inherent in MS Project and not to do with using VBA I hoped someone here might be able to advise a ...
RadTunesly's user avatar
0 votes
2 answers
449 views

How do I create a running total/ cumulative formula in Microsoft Project

In Excel I can make a chart like this very easily using the formula =SUM($X$Y:XY) where X is the starting Letter of the column on the left and Y is the starting number of the column on the left. The ...
Michael Li's user avatar
0 votes
1 answer
138 views

start after task finish but must end as finish to finish to another task

I have task B which cant start until task A is finished (FS) but must end with task C end date (FF)(i.e. duration of B might be floating depending on the end of task A and end of task C) .. is this ...
osama yaccoub's user avatar
1 vote
1 answer
88 views

MS Project assigning one resources to multiple task

I need help assigning my Project Lead to a report writing task on a specific day. However, the Project Lead is also assigned to a system testing task that runs for a longer period and has multiple ...
Steve Chester's user avatar
0 votes
1 answer
47 views

Let MS Project decide which worker to assign

Say I have a project with multiple tasks and two workers available. Each worker can work on each task, some tasks need both workers, others only need one worker. How can I do this in MS Project? If a ...
debsim's user avatar
  • 103
0 votes
1 answer
59 views

How do I make these tasks so flexible that changes mid construction are easy to make?

I have 4 tasks A-D, each one is a predecessor to the next. My schedule baseline is A->B->C->D. However, tasks A-C order is flexible and doesn't matter which one comes first, they just can't ...
Megan's user avatar
  • 1
0 votes
1 answer
381 views

MS Project Custom Field Summary roll up not totalling

I am struggling to see an option in MS Project when using a custom currency field for the the summary task to total. It shows a zero and I dont know how to change it. See screenshot below. Any ...
Derek B's user avatar
0 votes
2 answers
214 views

How do interpret a negative variance value? What does it mean when I have a negative variance in my schedule?

My schedule shows an overall variance value of -1%. Does that mean schedule slippage or the opposite?
Mariarosa Albertin's user avatar
1 vote
1 answer
113 views

Is it possible to start with the amount of hours each person needs for each task and their availability, then drive the project schedule from that?

Following this question, I have a hierarchical list of tasks. I have asked my team members to tell me how much time they need for each task. I also know the interdependency between those tasks. take ...
Foad's user avatar
  • 111
2 votes
0 answers
64 views

MS Project 2019 (or lower) scheduling algorithm

Whats resource constrained scheduling algorithm is used by MS Project 2019? What RCPSP algorithm is behind a so called a resources leveling in MS Project 2019?
JackAW's user avatar
  • 21
0 votes
1 answer
288 views

What is the field name of Resource Names in MS Project

I'm trying to identify the field name of Resource Names, which I believe is an out of the box MS Project column. I need this information to map this field into a ServiceNow import and came across this ...
Benjamski's user avatar
1 vote
2 answers
132 views

Under what circumstances does resource levelling become necessary?

Sorry for the preamble here - but I think the context is important. I'm responsible for tracking progress on a project which runs on a NEC3-ECC contract which requires that programmes (implemented in ...
CapriciousMelon's user avatar
0 votes
3 answers
100 views

How do I represent a task that starts and ends in one business day

Should the task start and end date be the same? But if I change duration to 1 day, the end date shows the next day
Hr jk's user avatar
  • 1
0 votes
2 answers
109 views

Change from waterfall to agile [closed]

I have been working on different kind of software projects implementation using the water fall methodology. now some of my clients want to shift to agile methodology. what do I need to take into ...
Nour Atwy's user avatar
0 votes
1 answer
202 views

Add predecessor to all tasks "x" number of tasks before it - Microsoft Project

Currently scheduling a 26 level building, and all 26 levels follow the same schedule. For example: Level A -Task A -Task B -Task C Level B -Task A -Task B -Task C Task X occurs on each level and it's ...
Joel's user avatar
  • 1
0 votes
0 answers
38 views

Global calendars in Formula

I have the following problem and can not find a solution on google. ProjDateAdd([Start9];[Duration9];"myCal") The formula is in the field finish9 and only works if the global calendar "...
Lukas Schmölzl's user avatar
0 votes
2 answers
84 views

MS Project - Measuring Tasks by Days

Is there a way to discard of hourly measurement in MS Project, and instead having it track only the amount of days I input?
Tyler Rogers's user avatar
0 votes
2 answers
158 views

MS Project: How to plan tasks that have no particular order?

I am involved in software development and I have a total of 35 features that need to be implemented in our software. Each feature has been estimated for the time it will take, and there are 5 ...
Thorsten Koch's user avatar
0 votes
1 answer
87 views

Dynamically linking a date

Here is my question: I have a go/no-go meeting on the calendar for go-live. We always do go lives on Tuesday. I want to dynamically link the date to always pick the next Tuesday after the go-live. ...
Steven Martin's user avatar
0 votes
4 answers
322 views

Toggling the format of dates in MS Project

I often have to change the format of the date to check and "adjust" new sequences activities. It is very inconvenient to click always through the menu so I tried to find some VBA-macros for ...
Daniel's user avatar
  • 1
0 votes
1 answer
2k views

How to stop MS Project from changing durations when adding resources?

I need to add 2 extra people to a certain task that currently has 4 resources assigned. As soon as I add one, project automatically extends the duration of the task without reason. I've tried ...
Eustaquio's user avatar
0 votes
0 answers
175 views

Clear cache in MS Project Standard 2019

MS Project Professional allows you to do cache clearing, but is there a way to do cache clearing in MS Project Standard? If MS Project Standard does not provide this possibility from the menus is it ...
Upax's user avatar
  • 158
1 vote
1 answer
216 views

How can a generic resource be overallocated?

MS Project. My understanding is that a generic resource is specifically of infinite availability. That's why it's generic. So in the very early stages of our journey to implementing resource ...
Maxcot's user avatar
  • 113
1 vote
2 answers
65 views

Is it possible to have personal backlogs and planning according to the prioritization of the tasks?

Microsoft Project is ok for setting up for Gannt Chart and baseline but it is not possible to see individual plans and schedules. Is it possible to integrate all? is it possible to have personal ...
alfonso's user avatar
  • 121
0 votes
0 answers
40 views

MS Project Calendar Mismatch between Server and Client

we use MS Project Professional, connected to Project Server 2016. Our standard working times on the server calendar are as follows: Mon 8.00 - 12.00, 13.00 - 16.30; Tues 8.00 - 12.00, 13.00 - 16.30; ...
Marc Williams's user avatar
1 vote
1 answer
632 views

Calculation of ACWP, BCWP and BCWS in MS Project

I took a look at how MS Project calculates EVM metrics and I have a doubt that I would like to clarify. Before performing the calculations of ACWP, BCWP, and BCWS, I defined a baseline. To avoid ...
Upax's user avatar
  • 158

1
2 3 4 5
14