How do you increase velocity in scrum [closed]

Scrum uses velocity as a metric. How do we increase velocity in scrum
14
votes
3answers
2k views

Is velocity a valid measure of team and process improvement?

I've asked this question to few scrum masters: "How do you tell, that your team is improving? How do you tell that actions taken during retrospective result in real improvement in efficiency/...
0
votes
2answers
61 views

Does velocity change if the storypoints are changed in the particular sprint?

With the development team of 10 members. Project should be completed in 2 sprints. If the team plan to change the story points, does velocity of the team change? If so which type of velocity changes?
1
vote
2answers
73 views

How will team changes impact velocity of a Scrum project?

Question If there are 8 members in a team assigned to complete the project. 20% of the team left during the particular sprint. Does the velocity change? If so, what would the velocity changes be? ...
2
votes
2answers
140 views

If Velocity should not be used for future estimations, what is it good for?

I have read the following thread and a few articles sharing the same view - velocity should not be used for predictions. This has somehow rocked my world, as we often look at the velocity, remaining ...
4
votes
3answers
374 views

Is there a relationship between technical debt and velocity?

Per my understanding, velocity is just a metric used to forecast work for future sprints, therefore it has no significance other than for planning purposes. Even if technical debt exists, my ...
4
votes
2answers
106 views

Velocity calculation based on number of user stories completed in a sprint

In one of the projects, the velocity calculation is done based on the number of user stories that the team is delivering in each sprint. They are using story points to size but still the velocity is ...
3
votes
1answer
218 views

Sprint planning, review: velocity,capacity, forecast and how this values relate?

I'm fairly new to Scrum and its sprint planning/retro (etc), our team today was trying to calculate velocity, capacity and forecast for the following sprint, but we just realised that no one actually ...
1
vote
6answers
1k views

Velocity of the team

If i have been provided with the information of six sprints having story points like 20,21,22,23,24,25,26 then what should be the velocity of the team ?
2
votes
2answers
125 views

Should we count a story that is no longer required by Client/PO/Management in our velocity?

We have finished a story which is no longer required by the Product Owner (PO) or Management. The completed story is not going to add any business value. What should we do in this case? Should we ...
0
votes
3answers
14k views

Scrum , Velocity calculation and Sprint Calculation

Following figures showing the performance of a Scrum team during the first 6 sprints of a project. Sprint: 15 SP Sprint: 5 SP Sprint: 20 SP Sprint: 15 SP Sprint: 25 SP Sprint. 10 SP Question 1: ...
3
votes
2answers
2k views

How to calculate velocity when using fibonacci estimates

We are using Scrum and our user stories are estimated using the Fibonacci sequence. I understand the benefit of using the Fibonacci sequence for estimates. In all references to velocity it is ...
1
vote
2answers
91 views

pivotal tracker chore: At what rate velocity should increase

The definition of velocity is “Just like a speedometer that measures how fast you’re hurtling through space, Tracker’s velocity is a measurement of how fast your team completes stories. Instead of ...
4
votes
2answers
162 views

Velocity at different project phases

We are running Scrum on waterfall-style projects. This means that we use Scrum as a planning unit, conduct the ceremonies, have the PO/Scrummaster roles, but we do not have a customer-facing release ...
16
votes
4answers
3k views

Should velocity increase with time?

Some scrum masters are concerned with "bumping up" a team's velocity during a sprint, as if a higher velocity is better. But points are a relative measure of the work that a team needs to do for ...
2
votes
5answers
831 views

Team velocity dramatically slows down to the end of a sprint

I have noticed that team velocity sometimes becomes "negative" near to the end of a sprint. There's few trivial story's/bugs left but they took extraordinary effort to finish. Team seem's not to be ...
1
vote
4answers
1k views

How do you measure time units in sprint velocity?

I am trying to get my head around "Story points" using the Scrum methodology. As a starting point, I have been following the following article: http://scrummethodology.com/scrum-effort-estimation-and-...
0
votes
1answer
96 views

Mobile apps: integrate backend work in velocity?

Here is my situation: I work with two SCRUM teams, iOS and Android Each of the SCRUM team has its own Product and Sprint backlogs We have shared Sprint Plannings, Reviews and Retrospectives (both ...
0
votes
1answer
97 views

Outsourcing company: Usage of velocity for offers

Currently I am working in an outsourcing company and our management has decided to use the following scheme for "Velocity of the developers": Each developer has a velocity quotient: Senior Developer:...
2
votes
4answers
735 views

Is a zigzag, sawtooth velocity a problem if the trend is consistent?

I am supporting and coaching several scrum teams working on different areas of the same software project. Sprints are 4 weeks long, except that sprints spanning the Christmas/New Year holidays are 5 ...
3
votes
2answers
1k views

How to manage sprint velocity when someone does both design & development?

Background I work at a startup where I'm the only designer (UI/UX/Visual), however, we don't have an actual front-end developer, so most of the HTML/CSS development also falls on me as I'm half-...
2
votes
2answers
621 views

How does the team deliver consistent velocity when user stories are de-scoped mid-way through a sprint?

We are using the Rally tool for managing our sprints. Mid-way through one of the sprints, the Product Owner de-scoped two user stories. These two stories are complex user stories carrying 8 story ...
5
votes
5answers
11k views

How to estimate accurate velocity when team members are on leave

I am a Scrum Master of a team with 12 members. I know that the size of the team is large at this point, but as we grow further we will divide the team into multiple Scrum Teams. Our estimations for ...
11
votes
5answers
3k views

Team velocity fluctuates a lot, how to find the root cause?

I have plotted my team burn up chart and its velocity per iteration. To me it looks really bad (velocity fluctuates a lot). What should I be looking for to diagnose the root cause of this behaviour?
8
votes
3answers
1k views

Is it possible to track velocity on a waterfall project?

Assuming similar work has been done in the past, can velocity be measured on a waterfall project? If that isn't the case, is there a more appropriate capacity management tool on a waterfall project?