Rex Butler
  • Utah, USA
  • Member for 4 years, 11 months
About

I am a software engineer / systems analyst in real life. I love to code. Alumni of The University of Utah - Department of Mathematics (MS). I have a deep and abiding interest in the Foundations of Mathematics and its various subfields, especially discrete mathematics, abstract algebra, the foundations of analysis, and point set topology. I think Primitive Recursive Arithmetic is pretty neat. I love mathematics as a language to converse in and think with and as a way to formulate questions, if not always answer them. I play a lot of chess. Former display name "Thoralf Skolem".

Badges
This user doesn’t have any gold badges yet.
This user doesn’t have any silver badges yet.
2
bronze badges
Top tags
0
Score
1
Posts
100
Posts %
0
Score
1
Posts
100
Posts %
0
Score
1
Posts
100
Posts %
0
Score
1
Posts
100
Posts %