Omnifarious
I'm offering my services as an online tutor for Python on TeachStreet. And if you feel like giving me a tip for a good answer, send me some Bitcoins at 1bDMa8UcyHX71kNJUVcCyrDCkum3TDybQ.
I've been programming since I was 8. I started with Apple Basic, then Timex Sinclair (ZX-81 at the time) Basic. After that I discovered the list of op-codes next to the ASCII chart in my ZX-81 manual. I began to compile my own hand-lettered sheets that put all the addressing modes of a given instruction in the same place so I could more easily handle-assemble small machine language programs.
It's gone on from there. The learning never ends.
Currently I do most of my programming in Python and C++ on Linux. I have a strong preference for Open Source software.
I've noticed that this site tends to have a slight bias for existing members. Members with a higher reputation tend to be voted up more even if their answer is very similar to someone else's with a lower reputation.
-
Seattle, Washington United States
-
Member for 9 years
-
1 profile view
-
Last seen Jan 25 '12 at 21:40
Communities (40)
Top network posts
Keeping a low profile.
This user hasn't posted yet.