Matthieu M.'s user avatar
Matthieu M.'s user avatar
Matthieu M.'s user avatar
Matthieu M.
  • Member for 2 months
  • Last seen more than a month ago
About

Software Engineer at Darley Technologies since 2022.

Avid follower of the Rust project, and still following Clang/LLVM (which I helped improved a bit with -Wdelete-non-virtual-dtor).

Known to dabble in Python for scripting purposes.

Interested in language design, and thus very interested in Rust (zero-cost memory safety, zero-cost data-race safety, concurrency) and interested in Haskell (type system, functional paradigm), which I unfortunately did not had time to explore yet...

Interested in compiler design and low-level technics: Memory Allocation/Garbage Collection, Compiler Optimizations, Link-time Optimizations.

Favorite answers of mine:

Favorite answers from others:

Badges
This user doesn’t have any gold badges yet.
This user doesn’t have any silver badges yet.
1
bronze badge
Posts

This user hasn’t posted yet.