Peter Mortensen
(Last updated 2013-11-25.)
Every time you make a typo, the errorists win.
Experienced application developer. Software Engineer. M.Sc.E.E. C++ (10 years), software engineering, .NET/C#/VB.NET (7 years), usability testing, Perl, scientific computing, Python, Windows/Macintosh/Linux, Z80 assembly.
Selected questions, etc.:
- Windows error codes (MSDN), e.g. 0xC000042C for STATUS_ELEVATION_REQUIRED.
- End-of-line identifier in VB.NET?
- How to determine if a .NET assembly was built for x86 or x64?
- Good tutorial for WinDbg?
- C++ reference - sample memmove
- The difference between + and & for joining strings in VB.NET
My other accounts:
Server Fault (SF). [/].
Super User (SU). [/].
Meta Stack Overflow (MSO). [/].
Other
My 15 minutes of fame on Super User
Blog. Sample: Jump the shark.
@PeterMortensen (Twitter)
Full jump page with other SOFU related, Stack Exchange sites, etc.
Contact
I can be contacted through this reCAPTCHA (requires JavaScript to be allowed from google.com).
-
Århus, Denmark
-
Member for 5 years, 9 months
-
2 profile views
-
Last seen Oct 1 at 13:24
Communities (154)
Top network posts
Keeping a low profile.
This user hasn't posted yet.