Skip to main content
3 events
when toggle format what by license comment
Jul 10, 2015 at 10:59 history edited David CC BY-SA 3.0
added non-numeric story points explanation
Jul 8, 2015 at 8:18 comment added Nathan Yes. As a general point a lot of what Scrum is about is success (or failure) as a team. I wouldn't even break it down to how many points a Junior/Senior Engineer can do if you have access to something better, like historical velocity.
Jul 8, 2015 at 1:21 history answered David CC BY-SA 3.0