Timeline for How to justify integration costs to a client?
Current License: CC BY-SA 3.0
2 events
when toggle format | what | by | license | comment | |
---|---|---|---|---|---|
Jul 13, 2016 at 4:41 | comment | added | Barry A. | Thanks for the answer. As I said, the vendor refuses to engage with us for any kind of study of their system until the client signs a contract with them. And the client refuses to sign a contract with them until we sign off on a price and timeline that he finds 'acceptable'. | |
Jul 13, 2016 at 1:23 | history | answered | SBWorks | CC BY-SA 3.0 |