Jan 7, 2019 at 9:31 comment added rapscalli i think the comment "Unless a change goes through a formal process and is accepted, your schedule should be baselined and unchanged." is a perhaps little too proscriptive. A project should have tolerances, and changes should be allowed within those tolerances.