Skip to main content
deleted 5 characters in body
Source Link
Sarov
  • 14.8k
  • 5
  • 34
  • 64

In Scrum, is a Scrum Master position higher than a Product Owner, in terms of organizational hierarchy?

At work, there traditional organizational charts isare a must,must; how are Scrum Masters and Product Owners placed? Do they assume an equal level? or oneOr should one be reporting to another?

In Scrum, is a Scrum Master position higher than a Product Owner, in terms of organizational hierarchy?

At work, there traditional organizational charts is a must, how are Scrum Masters and Product Owners placed? Do they assume an equal level? or one should be reporting to another?

In Scrum, is a Scrum Master position higher than a Product Owner, in terms of organizational hierarchy?

At work, traditional organizational charts are a must; how are Scrum Masters and Product Owners placed? Do they assume an equal level? Or should one be reporting to another?

Scrum Master and Product Owner are part of Scrum.
Link
Loading
Loading
Tweeted twitter.com/#!/StackProjects/status/628899533607600130
Source Link
Loading