Does a out of sprint Do bugs needsfrom previous Sprints need to be estimated?

SayFor example:

In sprint in Sprint 2, on story, A Tester raises 4 bugs and. 2 bugs got fixed in the same sprintSprint. The remaining 2 waswere pushed to backlogthe Product Backlog. At the sprintSprint 6, we are picking those 2 bugs of story A to fix it.

Now does thisDo these 2 bugs (out of sprint) needsneed to be estimated for Sprint 6?

Pls clarify.

Thanks, Kannan

Does a out of sprint bugs needs to be estimated

Say:

In sprint 2 on story A Tester raises 4 bugs and 2 bugs got fixed in same sprint. The remaining 2 was pushed to backlog. At the sprint 6, we are picking those 2 bugs of story A to fix it.

Now does this 2 bugs (out of sprint) needs to be estimated?

Pls clarify.

Thanks, Kannan

Do bugs from previous Sprints need to be estimated?

For example: in Sprint 2, on story, A Tester raises 4 bugs. 2 bugs got fixed in the same Sprint. The remaining 2 were pushed to the Product Backlog. At Sprint 6, we are picking those 2 bugs of story A to fix.

Do these 2 bugs need to be estimated for Sprint 6?

Source Link

Does a out of sprint bugs needs to be estimated

Say:

In sprint 2 on story A Tester raises 4 bugs and 2 bugs got fixed in same sprint. The remaining 2 was pushed to backlog. At the sprint 6, we are picking those 2 bugs of story A to fix it.

Now does this 2 bugs (out of sprint) needs to be estimated?

Pls clarify.

Thanks, Kannan