SayFor example:
In sprint in Sprint 2, on story, A Tester raises 4 bugs and. 2 bugs got fixed in the same sprintSprint. The remaining 2 waswere pushed to backlogthe Product Backlog. At the sprintSprint 6, we are picking those 2 bugs of story A to fix it.
Now does thisDo these 2 bugs (out of sprint) needsneed to be estimated for Sprint 6?
Pls clarify.
Thanks, Kannan